Government of Iraq
:şehir
132kV OHTL between Darelok S/S and Sarsang S/S
30km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Mar, 2014
Line Design for 33 kV DC Tanjaro-Arbat OHTL
15km
Kapsam
Engineering
Şehir
Sulaimaniyah
Proje Süresi
Dec, 2016
DDG/10 Dohuk Governorate Tower Displacement Project
Kapsam
Engineering & Installation
Şehir
Duhok
Proje Süresi
Mar, 2017
132kV OHTL's Erbil Network Reinforcement (NET-2 package)
45km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
*
400kV DC OHTL between Zakho Power Plant and 400kV Dohuk S/S
40.9km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
*
Re-location of one tower in Khanzad - Salahaddin Line
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Oct, 2018
Relocation of 132kV OHTL Towers in Dohuk
DARIN Co.
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Nov, 2018
PHASE II - LOT 4, Turn Key of 132kV DC OHTL HADITHA - QA'EM
154km
Kapsam
Turnkey
Şehir
Baghdad
Proje Süresi
Mar, 2019
33kV D/C Connection 132kV Qaladze S/S by two lines with Chwarqurna-Qaladza 33kV line OHTL
11km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
132kV Diversion of D/C Dokan-Chwarqurna and Chwarqurna-Soran OHTL
1.3km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
132 kV Azmer Steel Factory-Existing 132 kV Chamchamal-Sulaimaniyah Line
2.4km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
June, 2012
132kV OHTL for Polteks Doga Steel Factory
3km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Nov, 2012
Reconductoring of ACSR Teal by HTLS Conductor on 132kV OHTL between Dibis - South Erbil
16km
Kapsam
Reconductoring
Şehir
Erbil
Proje Süresi
Nov, 2012
Reconductoring of ACSR Teal by HTLS Conductor on Erbil Ring
77km
Kapsam
Reconductoring
Şehir
Erbil
Proje Süresi
Sep, 2012
132 kV D/C GRD Cement Factory - New 132kV Bazian Switchgear
3km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Jun, 2013
132kV OHTL between Kalar - Chamchamal
140km
Kapsam
Stringing of Conductor & OPGW
Şehir
Sulaimaniyah
Proje Süresi
Jan, 2014
132kV DC OHTL between 132kV New Bazian Switchgear and Gasin Cement Factory
17.7km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Jul, 2014
132kV DC OHTL Qaiwan PPG Connection - KRG Network
3km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Apr, 2015
33 kV D/C OHTL for Tasluja - Kanikhan
36km - Dokan Water Project
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
July, 2008
132 kV D/C Gas Plant - South Erbil S/S OHTL
38km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jan, 2009
132 kV D/C Akre-Khabat OHTL
60km
Kapsam
Turnkey
Şehir
Erbil / Duhok
Proje Süresi
Sep, 2009
132 kV D/C Hawary Shar Park Connection OHTL
0.5km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Apr, 2010
33 kV D/C OHTL for Selahaddin Water Project
36km
Kapsam
Line Route & Profile Survey
Şehir
Erbil
Proje Süresi
Nov, 2010
132 kV D/C East Erbil - South Erbil OHTL
9km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Sep, 2009
33 kV D/C Kalar - Kifri –Rizgari -New Kalar OHTL
60km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
33 kV D/C Said Sadiq- New Halabja OHTL
18km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
33 kV D/C Khurmal - Halabja OHTL
17km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
33 kV D/C Qaladze - Khasa Water Project OHTL
2.3km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
Reconductoring of Two 132kV D/C OHTL and 33kV S/C OHTL in Chavy Tourism Center
2km
Kapsam
Stringing of Conductor & OPGW
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2011
33 kV D/C Mangesh-Sarseng OHTL
27km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Sep, 2009
132 kV D/C Faeda - Chrra OHTL
38.5km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Sep, 2009
132 kV D/C Khabat - Pirzin OHTL
26.3km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Sep, 2009
33 kV D/C Koya - Ashti OHTL
25km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
132 kV D/C Chwarqurna - Qaladza OHTL
32km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
33 kV D/C Dokan - Dokan Tourist Town OHTL
4.5km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2009
132 kV D/C Tasluja - Zargata OHTL
14km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Apr, 2010
132 kV D/C Chamchamal - Tasluja OHTL
7km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Apr, 2010
400kV / 132kV / 33kV Ağı
MoE
Kapsam
2200 KM OG VE YG EİH
Şehir
Irak
Proje Süresi
2008 / 2009
Design of New 132kV Çift Devre Direkleri
MoE
Kapsam
210 km OHTL İçin Yeni 132kV Çift Devre Direklerinin Dizaynı
Şehir
Bağdat
Proje Süresi
2020
MASS Global
:şehir
132 kV D/C MASS Cement Factory - New 132kV Bazian Switchgear
4km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Sep, 2015
132kV Connections for Qushtapa S/S
2km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Feb, 2017
132 kV DC OHTL Twin Teal Erbil PP - Qushtapa S/S
16.7km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Oct, 2018
132 kV DC OHTL Twin Teal Kasnazan -Shawys
15.5km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Oct, 2018
132 kV DC OHTL Twin Teal Erbil Center - West Erbil
18.7km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Oct. 2018
132 kV DC OHTL Twin Teal Azadi - West Erbil
5.5km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Oct, 2018
Reconductoring 132 kV OHTL West Erbil - Khabat
25km
Kapsam
Reconductoring
Şehir
Erbil
Proje Süresi
Oct, 2018
400 kV SC OHTLs in Baghdad (Besmaya Lines)
146km
Kapsam
Turnkey
Şehir
Baghdad
Proje Süresi
Sep, 2019
400 kV SC OHTLs in Baghdad
48km
Kapsam
Turnkey
Şehir
Baghdad
Proje Süresi
Nov, 2019
132 kV D/C Mass Steel Factory OHTL
20km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Sep, 2012
132kV OHTL's between Tanahi - East Dohuk & Sumail - Faeda S/S's
65km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Jul, 2013
132kV DC OHTL for Dohuk-Baadre-Akre SS
156km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jan, 2012
132kV OHTL between East Dohuk - North Dohuk
3.8km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Jan, 2014
132 kV Connection Works in front of Khabat & Shaqlawa SS
2km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jan, 2016
132 kV Connections and Lines for Khabat SS (including dismantling of exisiting lines)
4km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Feb, 2016
400kV SC OHTL between Erbil Power Plant and 400kV Erbil Center S/S
53.4km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Apr, 2015
400 kV SC OHTL AltunKopru S/S and Khabat
63.4km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jan, 2015
132kV DC OHTL - Spacer Replacement
Kapsam
Maintenance
Şehir
Sulaimaniyah
Proje Süresi
Sep, 2016
33 kV D/C Bazian Cement Factory OHTL
3.2km - Line I
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
June, 2009
33 kV D/C Bazian Cement Factory OHTL
3.2km - Line II
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
May, 2011
132 kV D/C Erbil Power Plant – Existing Azady-Dibis OHTL
11km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Apr, 2011
132 kV Chamchamal Power Plant – Existing 132 kV Chamchamal – Sulaimaniyah Line
0.5km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
May, 2011
132 kV D/C OHTLs in Erbil Governorate Project
217km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jun, 2011
Lafarge IRAQ
:şehir
132 kV Lafarge Cement Factory-Existing 132 kV Chamchamal-Sulaimaniyah Line
1.3km
Kapsam
Turnkey
Şehir
Sulaimaniyah
Proje Süresi
Jul, 2011
JIKA
:şehir
132 kV D/C Kani Speka – Chwarta OHTL
25km
Kapsam
Engineering
Şehir
Sulaimaniyah
Proje Süresi
Dec, 2012
PLAN
:şehir
33 kV D/C Bazian Can Factory - Bardakaraman OHTL
5.5km
Kapsam
Engineering
Şehir
Sulaimaniyah
Proje Süresi
Aug, 2013
33kV OHTL between Bestana - Kushtapa
14.9km
Kapsam
Engineering & Stringing of Conductor & OPGW
Şehir
Erbil
Proje Süresi
May, 2012
33kV OHTL between New Harir - Khalifan
14.8km
Kapsam
Engineering & Stringing of Conductor & OPGW
Şehir
Erbil
Proje Süresi
May, 2012
33kV OHTL between New Harir - Harir
11.9km
Kapsam
Engineering & Stringing of Conductor & OPGW
Şehir
Erbil
Proje Süresi
May, 2012
KAR
:şehir
132 kV OHTL DC between Kalakchi S/S and KPS2
22.1km
Kapsam
Turnkey
Şehir
Duhok
Proje Süresi
Feb, 2017
33 kV OHTL DC between Karachokh S/S - Pump Stations in Dawud
11km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Feb, 2017
33 kV OHTL SC for Pump Stations in Erbil
10.6km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Feb, 2017
33 kV OHTL DC for KAR Cement Factory in Erbil, Iraq
40.7km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Mar, 2017
Gantry Connection of 132 kV DC EGPP-Khabat OHTL
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Feb, 2017
400kV OHTL between Erbil Center S/S - Existing 400kV Network
66km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jun, 2013
400 kV SC AAAC 551 Khurmala PP- New Erbil Center SS OHTL
66.2km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Aug, 2013
132kV OHTL's for 400kV Erbil Center S/S
11.4km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jan, 2014
132kV OHTL between Soran-1 and Soran-2 S/S's in Erbil
10.3km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Mar, 2014
132kV DC OHTL for KAR Cement Factory
19km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jul, 2015
400 kV SC OHTL Qayyara S/S – Erbil Khurmala PP
58.9km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Jan, 2016
Shandz
:şehir
132kV OHTL's Erbil Network Reinforcement (NET-3 package)
90km
Kapsam
Engineering & Stringing for OHTLs
Şehir
Erbil
Proje Süresi
May, 2014
33kV DC OHTL for Halabja Water Project
13.6km
Kapsam
Engineering & Stringing
Şehir
Sulaimaniyah
Proje Süresi
Jul, 2015
DNO
:şehir
Line Design for 33kV OHTL DC in Tawke Oil Field
Kapsam
Engineering
Şehir
Duhok
Proje Süresi
Sep, 2017
World Metal Steel Factory
:şehir
132kV OHTL between World Metal Steel Factory and 400kV Erbil Center S/S
25km
Kapsam
Turnkey
Şehir
Erbil
Proje Süresi
Oct, 2014
Goverment of Türkiye
:şehir
Government of Georgia
:şehir
Construction Works of 8km of 500 kV D/C and 60 km of 220 kV D/C OHTL
Kapsam
Turnkey
Şehir
Georgia
Proje Süresi
Jan, 2020
500 kV Jvari- Tskaltubo OHTL and Associated 500kV Substation in Tskaltubo Lot 1: Construction of 500kV Jvari-Tskaltubo OHTL
77km
Kapsam
Turnkey
Şehir
Georgia
Proje Süresi
Sep, 2020
220 kV Adigeni-Shuakhevi Overhead Transmission Line section
39km
Kapsam
Turnkey
Şehir
Georgia
Proje Süresi
Apr, 2021
Government of Spain
:şehir
400kV Tek Devre Direkleri Tip Testleri
Kapsam
YG Tek Devre Direkleri Tip Testleri
Şehir
Sevilla
Proje Süresi
2020
TOLAN TRADING & SERVICES Co. Ltd.
:şehir
Training for Transmission Line , Tower Design and introduction to PLS CADD
Kapsam
Engineering & Consultancy
Şehir
SUDAN
Proje Süresi
Mar, 2013
PETROFAC INFRASTRUCTURE CONST. CO. S.A.L
:şehir
Line Design for 900km of 400kV and 220kV OHTL's in ALGERIA
900km
Kapsam
Engineering
Şehir
Algeria
Proje Süresi
Jan, 2014
Line Design for 66 kV OHTL's
16 km
Kapsam
Engineering
Şehir
Algeria
Proje Süresi
Mar, 2014
Distinct Trend & GECOL
:şehir
Training for Transmission Line , Tower Design and Introduction to PLS CADD
Kapsam
Training, Engineering & Consultancy
Şehir
Libya
Proje Süresi
Apr, 2016
Irak
Government of Iraq
MASS Global
Lafarge IRAQ
JIKA
PLAN
KAR
Shandz
DNO
World Metal Steel Factory
Türkiye
Goverment of Türkiye
Gürcistan
Government of Georgia
İspanya
Government of Spain
Sudan
TOLAN TRADING & SERVICES Co. Ltd.
Algeria
PETROFAC INFRASTRUCTURE CONST. CO. S.A.L
Libya
Distinct Trend & GECOL